Virginia Tech McComas Hall, Blacksburg, VA

WDP conducted a condition assessment of the stone masonry façade, precast façade, and windows to assess water leakage damage and causes.  Some areas of the stone masonry façade were not adequately attached to or supported by the concrete back-up wall.  The investigation included visual survey, selected invasive observations, water testing, petrography, and material testing. WDP provided recommendations and associated costs for repairs and maintenance.